{More photos coming soon that go with this story}
The Klamath Project at 100:
Conserving our Resources, Preserving our Heritage
1905-2005: The First Century of Water for the Klamath Project
Grain Truck, Lower Klamath Lake, 2004
Prepared by Dan Keppen, Executive Director
Klamath Water Users Association
December 2004
Background of Klamath Water Users Association
The original Klamath Water Users Association was organized on
March 4, 1905 under Oregon statute and capitalized in the amount of $2,000,000.
That Association was created by local farmers, livestock producers, businessmen,
bankers, attorneys, and community leaders interested in seeing the Klamath
Reclamation Project constructed with the least amount of cost and for the
lasting benefit of the entire Klamath community.
Working in cooperation with Reclamation the stockholders of the Association
contracted with the U.S. Secretary of the Interior to assume the responsibility
of payment to the United States the cost of the Klamath Project irrigation works
on November 3, 1905. The Association was active in bringing in lands to be
served by the Project and addressing water right matters of those lands. By the
1950’s much of the construction costs of the project had been reimbursed to the
United States, and irrigation districts assumed the contractual obligations for
maintaining and operating the Project.
The current Klamath Water Users Association (KWUA) has its origins in the
Klamath Water Users Protective Association, bylaws adopted June 22, 1953,
organized to address water right and electrical power issues for Klamath Basin
irrigators. The Protective Association reformed itself March 16, 1993 with
amended bylaws, and incorporated in 1994 as the modern Klamath Water Users
Association.
The KWUA represents private rural and suburban irrigation districts and ditch
companies within the Klamath Project, along with private irrigation interests
outside the Project in both Oregon and California in the Upper Klamath Basin.
The KWUA is governed by an eleven-person board of directors elected from
supporting irrigation districts, private irrigation interests, and the business
community. The KWUA now represents over 5,000 water users on 1,400 family farms.
KWUA’s mission statement: To preserve, protect and defend the water and
power rights of the landowners of the Klamath Basin while promoting wise
management of ecosystem resources.
Table of Contents Page
Executive Summary…………………………………………………………. 4
Introduction………………………………………………………………….. 5
Overview……………………………………………………………………… 7
Pioneers……….………………………………………………………………. 9
The Reclamation Act……………………………………………………….… 10
The Klamath Basin Calls in the United States Government………………. 10
Construction Begins.. ………………………………………………………... 11
Homesteaders….……………………………………………………………... 13
The Klamath River Compact….…………………………………………….. 15
The Klamath Project’s Finishing Touches ………………………………… 18
New Demands………………………………………………………………… 19
Sucker Listings………………………………………………………… 20
Coho Salmon Listing .. ………………………………………………... 21
Problems on the East Side…………………………………………………… 22
2001 Curtailment……………………………………………………………... 24
The Farmers Fight Back….………………………………………………….. 26
Enter President Bush.. ………………………………………………………. 27
Vindication: The National Research Council Steps In…………………….. 28
The Assault on the Klamath Project Intensifies….………………………... 29
Vindication, Part II…..………………………….………………………….... 32
“We hate to say we told you so, but….”..………………………….………... 33
The Klamath Project Regulatory Regime: 3 Years After the Curtailment. 34
Proactive Efforts of Upper Basin Landowners…….………………………. 36
Sucker Recovery Planning………………………….…………………. 36
On-the-Ground Actions………………………….…………………….. 36
Environmental Water Bank………………………….………………… 38
EQIP Funding in Klamath Basin………………………….…………… 39
Recognition at Last………………………….…………………………. 39
50 Years After the Compact – Back to the Watershed-Wide Approach….. 40
BOR Study on Pre-Project Flow Conditions on Upper Klamath River…... 40
Conclusion – The Future …………….………………………….…………… 41
Notes….………………………….………………………….…………………. 44
Photo Credits…………………………….………………………….………… 47
Executive Summary
The Klamath Project in 2005 marks its 100-year anniversary. This report
summarizes the original formation of the Project, describes the enthusiastic
response of the local community to the federal water project, and steps through
the development of the Project in ensuing decades. The story of the pioneers,
early settlers, and homesteaders who helped settle the area – veterans of both
world wars - provides a sense of the character possessed by local farmers and
ranchers, who had to rely on similar traits to keep their community alive when
irrigation supplies were curtailed in 2001. And it explains a very important
dynamic of the region, especially in recent years, where local water users are
attempting to proactively address water supply challenges while at the same time
trying to stave off a furious round of attacks launched by environmental
activists.
The immediate future remains uncertain for Klamath Project irrigators, but their
marked propensity for adapting to change will keep local farmers and ranchers in
business for another 100 years. In order to deal with the uncertain water
situation, and facing higher power costs in 2006, the 21st century Klamath
Project irrigator is adapting, by developing new market niches for products,
creating innovative approaches to energy use, conserving and marketing water,
and developing habitat for fish and wildlife. The same abilities shown by
pioneers and veteran homesteaders beginning over a century ago to carve out new
communities from the wilderness will now be employed to conserve resources and
preserve their remarkable and uniquely American heritage.
XXXXX
A load of produce from the Klamath Fair, October 1907.
The Klamath Project at 100: Conserving our Resources, Preserving our Heritage
“We desire to impress upon your mind the fact that 99% of the people in the
Klamath Basin are a unit, and are clamoring for the assistance which might be
rendered by the Government under the Reclamation Act.”
1905 Petition from Basin residents to the Secretary of the Interior
“The vision of the Klamath Basin as a place for human habitation must include
agriculture, and an agricultural sector of sufficient size to be economically
viable. This place ought to have an urban center and a scattering of pleasant
small towns - and in between green fields with dancing water from irrigation
works.”
Klamath Falls Herald & News Editorial
June 20, 2004
“Agriculture plays a vital role in this state’s economy. An economic issue is
one thing, for the farmers who need the resource, need the water, to be able to
make a living. There’s another piece to this that’s much larger for all Oregon,
and that is a cultural issue. The people here are very, very important to the
future of this state.”
Oregon Governor Ted Kulongoski,
At the A Canal Fish Screen, Klamath Falls, Oregon.
April 17, 2003
Introduction
The year 2005 marks the one hundred-year birthday of one of the oldest federal
water projects in the western United States – the Klamath Irrigation Project. As
was painfully made evident in 2001, when Klamath Project supplies were curtailed
for the first time in 95 years, the local community and its economy are
interwoven with the health of this irrigation project. One hundred years after
overwhelming national policy supported its construction, the Klamath Project
continues to play a critical role in the local community.
“The Klamath Project started out as a good thing, and it remains a good thing”,
said Tulelake farmer Rob Crawford. “When the Project was created, Klamath Basin
people were meeting a national call by doing what they were supposed to do -
settle the West. Today, our efforts focus on preserving our heritage, while
conserving our resources.”
At the beginning of the last century, when the local community learned that the
Klamath Project would be developed, an “incredible celebration” ensued, said
Paul Simmons, an attorney for the Klamath Water Users Association.
“The people of the Klamath Basin basically posed a proposal to the federal
government,” said Simmons. “They told the government, ‘if you will be the
plumber and the banker, we can do something good for the country.’”
The federal government did just that by constructing the irrigation project.
Local growers repaid the construction costs in the ensuing decades. Today,
thousands of people – family farmers and ranchers, their employees, and
agriculture-related businesses – make their living directly from farming and
ranching in the Klamath Project. In turn, their activities support the
communities of Malin, Merrill, Midland, Bonanza, Tulelake, Newell, and Klamath
Falls. And, equally important, their efforts yield high-quality safe food for
the country and the world.
The last century has been one of massive transformation, vitality, shining hope,
and deep despair for the farmers and ranchers served by the Klamath Project. The
core reason for the creation of the Klamath Project – to develop water supplies
and storage for irrigation uses – has been diminished as new competing demands,
intended to satisfy Endangered Species Act (ESA) and tribal trust conditions,
have come on line. As a result, after perceived ESA and tribal trust obligations
are met, Klamath Project irrigators and national wildlife refuges essentially
get the remaining water. Because very little carryover storage is provided by
Klamath Project reservoirs, the farmers now find themselves becoming
increasingly reliant on incoming flows to the reservoirs, rather than the stored
water that was originally developed to provide them with a reliable summertime
irrigation supply.
In essence, because of new laws and policies developed in the recent past, the
original purpose of the Klamath Project has been somewhat lost in the shuffle.
This became glaringly obvious in 2001, when for the first time in 95 years,
water supplies to the Klamath Project from Upper Klamath Lake were curtailed
before the irrigation season had even begun, to meet conditions set by federal
fishery agencies to purportedly prevent harm to three fish species.
Three and one-half years after Klamath Irrigation Project (Project) water
deliveries were terminated by the federal government, local water users are
attempting to proactively address water supply challenges while at the same time
trying to stave off a furious round of attacks launched by environmental
activists. Project irrigators – who farm on lands straddling the
California-Oregon state line - remain apprehensive about the future certainty of
water supplies. However, the strong traits shown by the original Klamath Project
settlers – self- independence, creativity, a sense of community – are still
apparent, one hundred years later. Without these characteristics, the tragic
events of 2001 might have become nothing more than passing headlines in the
local newspaper. Instead, a galvanized community grabbed national media and
political attention by forcing the rest of the country to see that things had
gone too far.
Now, Klamath Project irrigators are preparing for the next 100 years. In order
to deal with the uncertain water situation, and facing higher power costs in
2006, the 21st century Klamath Project irrigator is adapting, by developing new
market niches for his products, creating innovative approaches to energy use,
conserving and marketing water, developing habitat for fish and wildlife, and
improving the symbiotic relationship he has with neighboring national wildlife
refuges. The same abilities shown by pioneers and veteran homesteaders to carve
out new communities from the wilderness will now be employed to conserve
resources and preserve their remarkable and uniquely American heritage.
Overview
The irrigable lands of the Klamath Project (Project) are in south-central Oregon
(62 percent) and north-central California (38 percent). Two main sources supply
water for the Project: Upper Klamath Lake and the Klamath River on the Klamath
system; and Clear Lake Reservoir, Gerber Reservoir, and Lost River on the Lost
River system, are in a closed basin. The total drainage area for the Klamath
Project, including the Lost River and the Klamath River watershed above Keno,
Oregon is approximately 5,700 square miles.
Currently, approximately 225,000 acres, many previously submerged, have been
transformed into productive farmland. The crops grown within the Klamath Project
area consist of grain, hay, pasture, silage, mint, potatoes, onions, other
vegetables, alfalfa, strawberry rootstock, and horseradish. This list of crops
represents the majority of planted acreage within the Klamath Project over the
last 40 to 50 years. The cropping pattern has varied from year to year, but the
overall planted acreage has remained consistent.
The Bureau of Reclamation operates Clear Lake Dam, Gerber Dam, and the Lost
River Diversion Dam. The Link River Dam is operated by the Pacific Power and
Light Company in accordance with Project needs, or more recently also as
directed by federal agencies. The Tulelake Irrigation District operates the
Anderson-Rose Dam, and the Langell Valley Irrigation District operates the
Malone and Miller Diversion Dams. The various irrigation districts operate the
canals and pumping plants.
The original Klamath Project plan included construction of facilities to divert
and distribute water for irrigation of basin lands, including reclamation of
Tule and Lower Klamath Lakes, and control of floods in the area. The development
of the stored water provided by the Klamath Project allowed for the controlled,
beneficial use of water in the Upper Basin. Currently, late summer and fall
flows in the Lower Klamath River are augmented with stored water that would not
be there, but for the Project.
Under pre-Project conditions, natural controls existed below both Upper Klamath
Lake and Lake Ewauna which stabilized lake levels except during critical
droughts. Those controls were natural reefs of hard earth material in the
channel and other channel constrictions. Under these pre-Project conditions, the
Klamath River flowed into the Lower Klamath Lake area. A 1906 map titled
“Topographic and Drainage Map, Upper and Lower Klamath Project” shows the invert
of the Klamath Strait approximately the same level as the Klamath River channel
bottom near Keno. In addition, the Lost River terminated at Tule Lake. These
flows flooded approximately 183,000 acres within Lower Klamath and Tule Lake. In
general, under pre-Project conditions, Klamath River flows downstream of Keno
likely occurred after a certain water level was reached in the Klamath River and
Lower Klamath Lake.
An engineer speaking in the early days of the Project observed that adequate
Klamath Project water supplies were not a worry. Rather – something that would
be inconceivable today - dealing with too much water was more of a concern at
the time:
“It contains an irrigation problem, an evaporation problem, a run-off problem,
any one of which is difficult in itself but all of which together form a most
perplexing whole,” said the engineer. “In nearly all reclamation projects water
has to be conserved. In this project there is more than enough and the question
of disposing of it becomes an important part.”
1906 Map of Pre-Project Area
Pioneers
Irrigation development began in areas now served by the Klamath Project in the
latter half of the nineteenth century. Various landowners and entrepreneurs
utilized water of the Klamath River and its tributaries, and undertook a wide
range of visionary activities.
Prime farmland, exposed around the edges of old historic Tule Lake as early as
1846 stimulated early settlers’ interest in irrigation. Similarly, early
settlers beginning in the early 1860s relied on “naturally irrigated” greases
and forage in the Lower Klamath area for pasture and hay. The first irrigation
ditch was dug by George Nurse and Joseph Conger in the bottom of Linkville
Canyon in 1868. In 1878, this ditch was expanded and incorporated into the
Linkville Water Ditch Company. Early pioneers Steele and Ankeny pursued a canal
to deliver water to land between Klamath Falls and Merrill. Ultimately, the
canal system was replaced by the A Canal and its distribution system which,
operated by Klamath Irrigation District, continues to serve Project land to this
day.
Adams Cut, July 18, 1906.
Diversion for irrigation of additional agricultural lands in the area now
comprising the Klamath Project was initiated in 1882 with construction of an
irrigation ditch by the Van Brimmer brothers to the land from White Lake, which
was fed by the Klamath River. Private interests further developed this project
by constructing the Adams Canal in 1886, which was supplied also from White
Lake. Frank Adams, with assistance from the Van Brimmer Brothers, cut a canal
through tule roots using hay-knives and a derrick, in order to improve diversion
from White Lake. This canal ultimately extended to a length of 22 miles. By
1903, approximately 13,000 acres were irrigated by private interests, with the
canal system in progress to deliver much more.
After the 1905 authorization of the Klamath Project (see below), many water
rights were acquired to facilitate, and for the benefit of, the Klamath Project
enterprise, and other agreements were made with other water right-holders. The
Project utilized, extended, expanded and/or improved previously existing
systems, and included construction of other facilities.
The Reclamation Act
In 1902 Congress enacted the Reclamation Act, which encouraged the settlement of
lands in the western states and the development of agricultural economies to
feed the nation. The 1902 Act provided for federal financing of irrigation
works, with the construction costs to be repaid over time by project water
users. In addition, public lands were made available for homesteaders who
accepted the responsibility to undertake improvements and pay the water charges.
Both the Oregon and California legislatures also enacted laws making state-owned
land available for use in the Klamath Project.
The Klamath Basin Calls in the United States Government
In 1903, the Reclamation Service conducted investigations that led in 1904 to
the first withdrawal of land by the Secretary of the Interior for developing a
federal irrigation project. J.B. Lippincott, a supervising engineer from Los
Angeles –who also played a key role in the City of Los Angeles’ securement of
Owens Valley water supplies – personally toured the Klamath Basin in June of
1904.
Although private irrigation projects were moving forward by the turn of the
century, and some large-scale projects were being planned, most local citizens
saw great value in a federally authorized and supported project. In 1905, local
residents sent numerous petitions to Washington, D.C. requesting government
irrigation assistance. By this time, a private corporation had given notion of
its plans to develop water for what would ultimately become virtually the entire
Klamath Project.
“We desire to impress upon your mind the fact that 99% of the people in the
Klamath Basin are a unit, and are clamoring for the assistance which might be
rendered by the Government under the Reclamation Act,” stated one petitioner.
In November 1904, F.H. Newell, Chief Engineer of the federal Reclamation
Service, told a large audience of enthusiastic farmers in Klamath Falls that, in
his judgment, they had “a great irrigation project”.
Early in 1905, California and Oregon had ceded certain rights in the Upper and
Lower Klamath Lakes and Tule Lake to the United States. On May 1, 1904, a board
of engineers made a report that served as the basis for authorization of the
Project. Congress authorized the use of lands and water in accordance with the
State Acts of February 1905. The Secretary of the Interior authorized
development of the Project on May 15, 1905, under provisions of the Reclamation
Act of 1902.
Construction Begins
The Interior Secretary’s 1905 authorization provided for project works to drain
and reclaim lake bed lands of the Lower Klamath and Tule Lakes, to store waters
of the Klamath and Lost Rivers, to divert irrigation supplies, and to control
flooding of the reclaimed lands. The states of Oregon and California ceded
then-submerged land to the federal government for the specific purpose of having
the land drained and reclaimed for irrigation use by homesteaders. The Oregon
Legislature also authorized the raising and lowering of Upper Klamath Lake in
connection with the Project, and allowed the use of the bed of Upper Klamath
Lake for storage of water for irrigation.
Construction began on the Project in 1906 with the building of the main “A”
Canal. Water was first made available May 22, 1907, to the lands now known as
the Main Division.
1907 Completion of the A Canal Headgates
This initial construction was followed by the completion of Clear Lake Dam in
1910, the Lost River Diversion Dam and many of the distribution structures in
1912, and the Lower Lost River Diversion Dam in 1921. (In 1970, a public
dedication at the Lower Lost River Diversion Dam officially changed the name of
the structure to Anderson-Rose Dam.)
Constructing Clear Lake Dam, September 1909.
Large stone in self-dumping car.
A contract executed February 24, 1917, between the California-Oregon Power
Company (now the Pacific Power and Light Company) and the United States
authorized the company to construct Link River Dam for the benefit of the
Project and for the company’s use, and also extended to the water users of the
Klamath Project certain preferential power rates. The dam was completed in 1921.
The contract was amended and further extended for a 50-year period on April 16,
1956.
The Malone Diversion Dam on the Lost River was built in 1923 to divert water to
Langell Valley. The Gerber Dam on Miller Creek was completed in 1925, and the
Miller Diversion Dam was built in 1924 to divert water released from Gerber Dam.
In the Great Depression, continued settlement and leasing and distribution
construction resulted in a significant increase, between 1930 and 1939 of the
acres receiving water directly from Project facilities. The project work
undertaken during this period included the enlargement of the Lost River
Diversion Channel.
In 1940, construction was begun on Pumping Plant D and the Tule Lake Tunnel. By
1942, these facilities, as well as the P-Canal were completed. In 1943, the Ady
pumping plant was placed in operation, and in the next two years, the Straits
Drain and pumps were constructed and installed and began operation.
Homesteaders
The story of the homesteaders is a source of great pride in the Klamath Project.
As Tule Lake receded according to plan, the lake bottom became suitable for
cultivation. The land that ultimately became homesteads was under jurisdiction
of the U.S. Bureau of Reclamation (Reclamation). Homesteading and developing
more productive agricultural land was the goal of the reclamation project that
“reclaimed” the beds of Tule Lake and Lower Klamath Lake to expose more arable
land. After Tule Lake was dewatered, a large area of public land became
available for agriculture. The government would lease this land to settlers, and
in fact leased as much as 50,000 acres in Tule Lake in the 1920s. Over time,
most of this land was homesteaded.
In 1917, 180 people applied for the 37 homestead parcels the Reclamation made
available on the drained wetlands and lake beds. Between 1922 and 1937 there
were five more homestead offerings and hundreds of homesteaders settled in on
the fertile soil of the drained lake bed. Then, World War II curtailed the
homesteading process.
1927 Homesteader Affidavit
In three drawings held in 1946, 1948 and 1949, a total of 216 World War II
veterans were awarded homesteads on farmland in the Tule Lake Basin, as a thank
you from a grateful nation. The number of applicants was far greater than the
number of available homesteads. Veterans and the community gathered to watch the
names drawn from a pickle jar. Farm homesteads and crop-producing land were the
goals of reclamation, and the Tule Lake Basin became a showcase for reclamation
work.
Farm Lottery Article - Life Magazine
Each winner received a small plot of land, and brought their hopes and young
families to the empty basin to further the development of the irrigation
project.
“When I heard about a homesteading opportunity in Tulelake, California I
applied,” Dave Carman told a congressional subcommittee in the summer of 2004.
“In 1948 I was one of 44 applicants chosen out of 2,000. At the time I had never
heard of Tulelake except as a great hunting area.”
The sign says it all.
“When I arrived to see my homestead there was nothing there, just an expanse of
opportunity,” recalls Carman. “No roads, no houses, no trees, just bare ground.
I then pitched my tent in the corner of my homestead.” My wife Eleanor was
expecting our second child, but could not join me until later. A tent was not
acceptable living quarters for a young woman, a small child and another baby on
the way.”
The settlers formed organizations, elected a school board, and went about
creating a society.
“When I began my new life as a Tulelake homesteader there were approximately 300
homesteaders, most of them with families,” said Carman. “We united and began to
build schools, churches and a hospital in Klamath Falls. We started a community.
We were living the American dream and our dream was achieved by hard work and
dedication, and I must say we could never have done this without our wives.”
Homesteaders: Robinsons in 2001 Remember Days Gone By
The Klamath River Compact
The Klamath River Compact (Compact) is a law of both Oregon and California,
consented to by and Act of Congress. In the following decade, a variety of
concerns and issues led to the passage of the Compact in 1957. These included:
Differing positions regarding the extent of development that could occur under
Klamath Project water rights;
The related issue of priority of Klamath Project and overall Upper Klamath
Basin irrigation development as against other uses, especially generation of
hydro-electric power on the mainstem Klamath River; and
Concerns over potential future out-of-basin water exports.
The development of the Compact was closely tied to an application for a water
right filed by the California Oregon Power Company (Copco) in 1951. This
application anticipated using water at a proposed hydroelectric project on the
Klamath River known as “Big Bend No. 2.” In turn, this dispute folded in past
dealings, agreements and opinions related to the operation of Link River Dam on
Upper Klamath Lake.
The agreements made between Copco and the Bureau of Reclamation at the time of
construction of Link River Dam around 1920 had been controversial. Upper Klamath
Basin irrigation interests had three primary concerns:
1. Power development, as an incident of the Project’s reclamation purpose,
should be undertaken only by the United States;
2. That the agreements threatened Klamath Project water supplies; and
3. The agreements were inconsistent with state legislation authorizing use of
Upper Klamath Lake by the United States for storage or reclamation purposes.
In 1951, Copco filed an application with the Oregon Hydroelectric Commission (OHC)
for a water right for the proposed Big Bend No. 2 hydroelectric facility. The
OHC at that time had authority and jurisdiction over issuance of water rights
for hydropower facilities. Copco at the time of filing took the position that
water was available for appropriation and Copco was entitled to a right, senior
in priority, to any future Upper Klamath Basin irrigation that was not then
actually developed.
J.C. Boyle Dam on the Klamath River.
Copco’s application to the OHC, and its parallel application to the Federal
Power Commission (FPC) for a license under the Federal Power Act, were contested
and opposed by the Department of the Interior and various agricultural and
irrigation interests. The OHC did not act on Copco’s application until 1956.
The States of California and Oregon appointed commissioners to negotiate an
interstate Compact. At the same time, Reclamation and local water users were
negotiating a new agreement with Copco for operation of Link River Dam. It
appeared that such an agreement might be concluded prior to enactment by the
States of a Compact. The draft Copco contract was brought before the Compact
negotiating commissioners, who sought to ensure consistency with the Compact
being developed. During the course of several meetings of the Compact
commissioners, terms were developed which resulted in conditions in the FPC
license, the water right certificate, and a new contract for Copco’s operating
of Link River Dam.
After preparation of various drafts, negotiation of the Compact was concluded
and the legislatures of Oregon, California, as well as the United States
Congress, acted in 1957. The major purposes of this compact are, with respect to
the water resources of the Klamath River Basin:
A. To facilitate and promote the orderly, integrated and comprehensive
development, use, conservation and control thereof for various purposes,
including, among others: the use of water for domestic purposes; the development
of lands by irrigation and other means; the protection and enhancement of fish,
wildlife, and recreational resources; the use of water for industrial purposes
and hydroelectric power production; and the use and control of water for
navigation and flood prevention.
B. To further intergovernmental cooperation and comity with respect to these
resources and programs for their use and development and to remove causes of
present and future controversies by providing (1) for equitable distribution and
use of water among the two states and the Federal Government, (2) for
preferential rights to the use of water after the effective date of this compact
for the anticipated ultimate requirements for domestic and irrigation purposes
in the Upper Klamath River Basin in Oregon and California, and (3) for
prescribed relationships between beneficial uses of water as a practicable means
of accomplishing such distribution and use.
The Compact recognized water rights for then-existing and future needs in the
Klamath Project service area. It also established a system of priority for new
water rights under which Upper Basin irrigation (up to a specified number of
acres) had superior rights over water for power generation, fish or wildlife, or
recreation.
In short, the Klamath Compact provided guidelines to lead the competing
interests of the Klamath River watershed towards a more harmonious future. For
the next 40 years, the intent of the Compact was essentially fulfilled, until
the early 1990s, when new pressures to address endangered fish and tribal trust
demands resulted in the reemergence of fractionalized conflict into the Upper
Basin. Although it had been seen as a resolution for future disputes, the
Compact has been interpreted not to override the Endangered Species Act or
tribal trust water rights.
The Klamath Project’s Finishing Touches
Through the 1950s, Reclamation envisioned continued development of the Project
that would have doubled its current size by including Butte Valley, California
and other areas. The plans were not implemented and the Project acreage has not
significantly increased since the end of the 1940s. In the following decades,
the delivery system has been improved, bottlenecks eliminated, and relatively
small areas have both been brought under irrigation and converted to commercial
or residential development.
By 1960, due in part to improvements made on Tule Lake dikes, the M Canal, the
Lost River Diversion Channel, and installation of new canals in the southern
portion of the Tulelake Irrigation District (TID) service area and the Miller
Hill Pumping Plant, the Project provided irrigation service to nearly 216,000
acres.
Tulelake, California
In the 1960’s, improvements and expansion of certain facilities led to the
formation of Klamath Basin Improvement District. The Stukel and Poe Valley
Pumping Plants were constructed and the Miller Hill Pumping Plant enlarged. The
D, F and G-Canals were also enlarged. These facilities provided more reliable
service to certain lands and also added land to the area that could receive
water from Project works.
In the 1970’s, Shasta View Irrigation District and Reclamation entered a $3.2
million contract for installation of a pressure irrigation system to replace the
previous gravity-fed system. The 1972 Project history reported, “…the Project
provided irrigation and drainage service to 223,661 acres,” while the total
harvested acreage “…was 193,160, down 2,329 acres from 1971.” Also in the
1970’s, the Straits Drain was enlarged.
Because of the Klamath Project’s design and the interrelated nature of water use
within it, including the use of return flows by farmers and the refuge, Project
efficiency is very high. A recent assessment of Klamath Project water use
efficiency implies that a sophisticated seasonal pattern of water use has
evolved in the Klamath Project. One must understand that the Klamath Project has
developed into a highly effective, highly interconnected form of water
management. According to the 1998 Davids study (see footnote), effective
efficiency for the overall Project is 93 percent, making the Klamath Project one
of the most efficient in the country .
New Demands
For eighty years, Klamath Project irrigation supplies proved sufficient to meet
the needs of the area’s burgeoning farming and ranching communities. Although
there were years where Mother Nature and Klamath Project storage capacity proved
insufficient to meet full irrigation demands, the local community managed to
stretch thin supplies and make things work. That all changed in the early 1990s,
when steadily more restrictive government agency decisions made to meet
Endangered Species Act (ESA) goals began to steadily chip away at the stored
water supply originally developed for irrigation.
Two sucker species were listed (1988) as endangered and coho salmon were listed
(1997) as threatened under the ESA. Since then, biological opinions rendered by
the U.S. Fish and Wildlife Service (for the suckers) and NOAA Fisheries (for the
coho), have increasingly emphasized the reallocation of Project water as the
sole means of avoiding jeopardizing these fish. Klamath Project “operations
plans” based on these biological opinions also factor in tribal trust
obligations, although the nature and extent of such obligations is undefined.
Sucker Listings
In the past twelve years, political and regulatory demands have affected
activities at the Klamath Project. In 1988, the short nose sucker and the Lost
River sucker, two species that live in Upper Klamath Lake, were designated as
endangered under the ESA. Biological opinions issued by the U.S. Fish and
Wildlife Service (USFWS) in 1992 and 1994 concerning operation of the Klamath
Project identified actions to avoid jeopardy to suckers. When the suckers were
listed, there had been no mention whatsoever of reservoir elevations as a factor
affecting sucker populations. These operation elevations were adopted by
Reclamation. The reservoir elevations pertaining to Upper Klamath Lake generally
allowed the Project to operate for its intended purposes. However, the United
States District Court of Oregon found that the reservoir elevations pertaining
to Clear Lake and Gerber Reservoirs to be arbitrary and capricious, and they
were invalidated in a succession of decisions .
The most compelling and prominent reason why the federal government justified
listing the two sucker species as “endangered” in 1988 was an apparent abrupt
downturn in both populations during the mid-1980s. To support the decision to
list the suckers, the USFWS believed the only significant remaining populations
were in Upper Klamath Lake. We now know that the assumptions by the USFWS were
in error and the assumed sucker population crisis never materialized. In fact,
shortly after listing of the species, the populations demonstrated dramatic
increases .
Just prior to the listing of the suckers in 1988, a sport snag fishery was
allowed. Before 1969, the fishery was largely unregulated with no harvest limit;
in 1969 a generous bag limit of 10 fish per angler was imposed. During the early
to mid-1980s, despite the belief that the numbers of fish were in a state of
rapid decline, the State of Oregon still allowed the sport snag fishery.
Ultimately, because of increased focus on the status of the sucker populations,
Oregon eliminated the fishery in 1987. Some fisheries experts believe that if
the USFWS would have properly assessed the known impacts on the suckers caused
by the snag fishery and the benefits from ceasing the fishery, it very likely
could have affected the ultimate listing decision.
“Simply stated, the largely unregulated snag fishery slaughtered the sucker
populations,” said Dave Vogel, with Natural Resource Scientists, Inc. “Since the
fishery was eliminated in 1987, the two sucker populations dramatically
rebounded. The threat was removed and the populations increased ten-fold.”
At the time of the listings in 1988, the Klamath Project was not identified as
having known adverse affects on the sucker populations, yet four years after the
listing, using limited or no empirical data, the USFWS turned to the Klamath
Project as their singular focus. Paradoxically, since the early 1990s, despite
new beneficial empirical evidence on the improving status of the species and
lack of relationship with Klamath Project operations, the USFWS became ever more
centered on Project operations and increased restrictions on irrigators instead
of paying attention to more obvious, fundamental problems for the species. This
circumstance caused tremendous expense in dollars and time by diverting
resources away from other known factors affecting the species.
Coho Salmon Listing
A similar circumstance occurred with NOAA Fisheries during and after the coho
salmon listing in the lower basin in the late 1990s. It cited the reasons to
list coho salmon, excluding Klamath Project operations as a significant factor
affecting the species. There are many other documented factors that have
affected salmon runs in the Klamath River . The USFWS in the 1980s described the
most important eight factors as “most frequently referred to with regard to
recent population declines” of anadromous fish in the Klamath River. Those
factors are:
Over fishing
Logging
Trinity River transbasin diversion
Irrigation diversions in lower Klamath tributaries
1964 flood
1976-1977 drought
Sea lion predation
Brown trout predation.
However, shortly following the listing, and with no supporting data, NOAA
Fisheries chose to center its attention on the Klamath Project as the principal
factor affecting coho salmon. In its biological opinions, NOAA Fisheries opined
that much higher than historic flow levels, released from the stored water of
the Klamath Project, would be needed to protect coho salmon downstream of Iron
Gate Dam. Iron Gate Dam is located forty miles away and coho are generally found
further downstream and in tributaries.
In essence, both agencies adopted a single-minded approach of focusing on
Klamath Project operations to artificially create high reservoir levels and high
reservoir releases. This puzzling, similar sequence of events has yet to be
explained by agency officials.
Commercial harvests of salmon intensified with the development of canning
technology. By the early 20th century, habitat destruction combined with
commercial harvests had resulted in serious salmon depletion on the Klamath
River. Cobb (1930) estimated that the peak of the Klamath River salmon runs
occurred in 1912, Snyder (1931) observed “in 1912 three [canneries] operated on
or near the estuary and the river was heavily fished, no limit being placed on
the activities of anyone”.
Problems on the East Side
Irrigation districts on the east side of the Klamath Project felt the first
impacts from increased regulatory focus on lake levels in the early 1990s.
Langell Valley Irrigation District (LVID) and Horsefly Irrigation District (HID)
receive water from Clear Lake and Gerber reservoirs. Historically, stored water
was released from these two reservoirs beginning about April 15 and ending about
October 15 each year. These reservoirs are not large, but they provide the
essential water supply to an otherwise arid area. In an average year, Clear Lake
releases about 36,000 acre-feet of irrigation water, and Gerber releases about
40,000 acre-feet.
Clear Lake Reservoir contains populations of both endangered sucker species, and
Gerber reservoir hosts one of the species. ESA-“threatened” bald eagles are also
known to inhabit the Klamath Project area. In 1991, at the request of the USFWS,
Reclamation initiated ESA consultation to assess the impact of the long-term
operation of the Klamath Project on the suckers and the bald eagle. In the next
year, three biological opinions were rendered by USFWS that imposed minimum
levels in Clear Lake to purportedly protect the sucker populations.
As a result of the minimum lake levels imposed by the draft biological opinions,
and the water lost to evaporation before the USFWS allowed any water releases,
the Districts were not able to make their normal irrigation releases during the
1992 water year. Neither district received its first seasonal water delivery
until May 15, 1992, a full four weeks later than normal. By that date, 12,000
acre-feet of the water that had been stored in Clear Lake in March 1992 had
evaporated, an amount that represents about 60% of LVID’s total yearly
withdrawal from Clear Lake Reservoir. As a result of the minimum lake levels and
the evaporation losses, only 2,148 acres of the 16,800 irrigable acres within
the LVID received any Klamath Project water at all.
The lack of water reduced both acreage farmed and per-acre yields that year. As
a result of reduced yields, farm properties lost up to 70% of their assessed
values in 1992. The lack of water also hurt the region’s cattle ranching
operations, because some ranchers could not produce pasture for their cattle.
Water users who could afford the extra expense purchased feed to sustain their
herds. Others had to cut back substantially on their herds or sell their cattle.
Wildlife also suffered as a result of the decision to impose minimum surface
levels in the reservoirs. Because the Lost River obtains most of its water from
releases from Clear Lake Dam and return flows from agricultural operations, the
water levels in the Lost River and its tributaries were exceedingly low in 1992.
As a direct result, wildlife relying on Lost River water, including deer,
sandhill cranes, hawks, turtles, frogs, ducks, and more, were all noticeably
scarce that year.
On July 22, 1992, USFWS finally issued its final biological opinion on the
long-term operations of the Klamath Project. While the 1992 opinion conceded
that “little” was known about Gerber Reservoir’s shortnose sucker population,
the opinion reported “good numbers” of these fish and noted that the Gerber
sucker population appeared to be successfully reproducing, despite the lowered
lake levels of the early 1990s.
Despite this undisputed evidence, the 1992 biological opinion concluded that
continuing to operate the Project, including Clear Lake and Gerber reservoirs,
in its historic manner was likely to jeopardize the continued existence of both
sucker fish species. Reclamation accepted the USFWS recommendations for
continued adherence to minimum lake levels, prompting the Districts and two of
the individual farmers to sue the federal agencies.
Even after the federal district court entered judgment invalidating the jeopardy
conclusions, USFWS defied this judgment, and the districts were forced to bring
several additional motions to enforce the Court’s rulings. At each stage of the
legal proceedings, the districts prevailed, based largely on the fact that USFWS
had no scientific evidence to justify its actions. When the United States
Supreme Court considered the Districts’ case against the USFWS, the Court
described the purpose of the ESA’s science requirement as follows:
The obvious purpose of the requirement that each agency “use the best available
scientific and commercial data available” is to ensure that the ESA not be
implemented haphazardly, on the basis of speculation or surmise. While this no
doubt serves to advance the ESA’s overall goal of species preservation, we think
it readily apparent that another objective (if not indeed the primary one) is to
avoid needless economic dislocation produced by agency officials zealously but
unintelligently pursuing their environmental objectives.
Now, ten years later, HID and LVID enjoy positive relationships with USFWS and
Reclamation. However, the problems they suffered in the early 1990s were a
harbinger of things to come for other Klamath Project irrigators shortly after
the turn of the new century.
2001 Curtailment
The net result of increasing restrictions on other Klamath Project water users
was fully realized on April 6, 2001, when Reclamation announced its water
allocation for the Project after U.S. Fish and Wildlife Service and NOAA
Fisheries officials finalized the biological opinions (BOs) for project
operations in a critically dry year. Based on those regulatory actions,
Reclamation announced that – for the first time in Project’s 95-year history -
no water would be available from Upper Klamath Lake to supply Project
irrigators.
April 6, 2001 Local Headlines
The resulting impacts to the local community were immediate and far-reaching.
Even with a later release of a small percentage of needed water over a 30-day
period in July and August, thousands of acres of valuable farmland were left
without water. In addition to harming those property owners, managers, and
workers, also imparted an economic “ripple” effect through the broader
community. The wildlife benefits provided by those farms – particularly the food
provided for area waterfowl – were also lost with the water.
Kliewer Family in Dry Fields South of Klamath Falls - 2001
The local farming community is still reeling from the April 6, 2001 decision,
and severe business losses echoed the hardship endured by farmers and farm
employees. As farmers and laborers attempted to deal with the loss of jobs, a
year’s income, and in some cases the land itself, referrals for mental health
counseling increased dramatically. The Tulelake school district lost around 50
students after farm families sold their land and moved on. Students were under
stress, understandably confused as to why three species of fish were more
important than their lifelong homes. Tragically, one Hispanic family had started
out as field workers, and after a lifetime of piecework under the sun had saved
enough to buy their own farm. They lost everything as a direct result of the
irrigation cutoff .
Veteran homesteaders, who fifty years ago were promised reliable water, felt
betrayed by the same government, who chose to provide water to fish instead of
farmers in 2001.
“I want the government to honor the contract that promised me and my heirs water
rights forever,” said Jess Prosser, a World War II veteran and Tulelake
homesteader, in 2001, after water supplies were cut. “This land is our life.
Farmers and fish have survived previous drought years when the farmers
voluntarily cut back on water consumption. The Klamath Project was designed to
withstand drought conditions, and right now there is more than ample water for
agriculture and fish. The government took 100% of the water for fish,
disregarding farmers, ranchers, families and numerous other species of wildlife
in the Klamath Basin. This is a man-made disaster. This will be the end of a way
of life and an entire community.”
Cemeteries Went Dry in 2001
The Farmers Fight Back
The local community did not take the decision lying down. Employing the
ingenuity and perseverance that allowed them to successfully create brand new
communities over the past century, local farmers, ranchers, elected officials
and business leaders organized a “bucket brigade” to dramatize their plight,
drawing nearly 20,000 sympathizers to the streets of Klamath Falls. A web site
and cell phone calling tree were set up, and farmers, who only a year before
were working their fields, suddenly became knowledgeable about the media. Civil
disobedience, in the form of peaceful protests at the A Canal headgates, drew
television crews from throughout the Pacific Northwest. The 2001 Klamath Basin
crisis became the topic of front-page coverage and sympathetic editorials in
publications like Time magazine, the Los Angeles Times, the Wall Street Journal,
and the New York Times.
Time Magazine Captures Rob Crawford & Family, Summer 2001.
In part because of the tremendous media and political attention generated by the
local community, a congressional field hearing was held in the summer of 2001 at
the Klamath County fairgrounds, which drew the largest audience to ever attend
such a hearing in the nation’s history. Much of the focus was on the
decision-making and processes that led to the fishery agencies’ recommendation
to curtail irrigation supplies.
In 2001, a desperate community essentially was looked in the eye and told,
“sorry, we know it may hurt, but ‘the science’ is compelling and requires you to
go without water.” This was wrong, literally, and as a matter of policy. For
whatever reason, the agencies had become too close to, and too much a part of,
the side-taking that had come to dominate issues surrounding the Klamath
Project. For this reason alone, outside review was needed.
Nearly 20,000 marchers support the Klamath Prayer / protest at the A Canal
headgates, 2001.
Bucket Brigade, May 2001.
Elected officials – from county commissioners and supervisors, to state
representatives and senators, to U.S. Senators and Representatives, continued
the fight, and ultimately, later in 2001, the U.S. Secretary of the Interior,
Gale Norton, directed the National Academy of Sciences to conduct an independent
peer-review of the agency decision to curtail irrigation supplies. Also, in
early 2002, President Bush himself took a personal interest in the plight of the
Klamath Project irrigator.
Enter President Bush
In January 2002, just months after the federal government curtailed Klamath
Project irrigation deliveries for the first time in 97 years, Sen. Gordon Smith
and Rep. Greg Walden met the president in southern California, boarded Air Force
One, and took a slight detour over the Basin on their way to a Portland high
school where the Mr. Bush was to deliver a speech. On the flight north, the
president was briefed on the 2001 Klamath water crisis. When he entered the
gymnasium at Park Rose High School, he opened his speech up with a pledge to
help both the farmers and the fish of the Klamath Basin.
Compassion: George W. Bush Meets and Greets
Klamath Basin Residents in Redmond, Oregon, 2003.
In the ensuing two years, President Bush has followed through with his pledge by
establishing a Klamath Basin cabinet-level working group, promoting sound and
independent peer-reviewed science, and making funding of Klamath River water and
environmental projects a priority. Enacted and requested Bush Administration
funding in the Klamath River watershed for fiscal years 2003-2005 exceeds $260
million dollars, according to a federal government summary. This includes $105
million proposed by the administration for Klamath Basin federal funding in the
Fiscal Year 2005 budget.
Vindication: The National Research Council Steps In
The Klamath Water Users Association and others in the community in 2001 strongly
advocated for an independent peer review of the 2001 fishery agency biological
opinions, the underlying science, and the related overall scientific process. In
early 2002, an interim report from the National Research Council (NRC) Committee
on Endangered and Threatened Fishes in the Klamath Basin was released. This
represented a critical step towards ensuring proper assessment and maintenance
of healthy fish populations.
The panel successfully completed an objective, unbiased initial review of the
information used by the U.S. Fish and Wildlife Service (USFWS) and NOAA
Fisheries to formulate the agencies’ two 2001 Biological Opinions (BOs). The
interim NRC report concluded that there was insufficient scientific evidence
used by USFWS and NOAA Fisheries in 2001 to support changing the recent
historical water operations of the Klamath Project. Specifically, the NRC
interim report concluded that higher or lower than recent historical lake levels
or Klamath River flows were not scientifically justified based on the available
information used by the USFWS and NOAA Fisheries.
Despite varying interpretations of the data used by the USFWS and NOAA Fisheries
in the BOs, it is especially noteworthy that the NRC panel achieved consensus on
the Interim Report’s conclusions for not just one, but both BOs. The report’s
conclusions were adequately supported by the available evidence and analyses
used by USFWS and NOAA Fisheries. It was particularly evident that the NRC
Committee report was fair and impartial, essential attributes that were sorely
lacking in Klamath basin issues to date.
The Assault on the Klamath Project Intensifies
The release of the NRC Committee’s interim report in early 2002 unleashed a
barrage of criticism from environmental activists and their allies in academia
and government agencies. Two Oregon State University professors, supporters of
the high lake level requirements that contributed to the 2001 water curtailment,
submitted a formal “rebuttal” of the interim report to a fisheries journal. The
“rebuttal” (so labeled when transmitted by its authors) and other media
developments caused the Klamath Project community to fear that the NRC work
would be diluted. The local community simply did not have the resources or the
networks of contacts to continually counter the anti-Klamath Project messages
that were being sent to the public and policymakers, primarily by outside
environmental activist organizations. The NRC Committee’s interim report
triggered what grew to be an extraordinary, and obviously coordinated, attack on
the Klamath Project by these interests. Media outlets seemingly relish a good
western fight, and many uncritically reprinted a good deal of information that
was not fair to Klamath Basin irrigators.
The scrutiny on the Klamath Project and the Bush Administration’s reliance on
the NRC interim report intensified further that fall, when 33,000 salmon died on
the lower Klamath River. Immediately after the unfortunate die-off, vocal
critics of Project operations and Bush Administration environmental policy used
the event to renew attacks on irrigated agriculture in the Klamath Basin. Even
though the fish die-off occurred 200 miles downstream from the Project, at a
location below the confluence of the main stem Klamath River and the Trinity
River, traditional advocates for higher river flows quickly assigned blame to
Klamath Project farmers and ranchers.
Some of these same interests and others in the environmental community even
attempted to directly link the fish die-off to alleged political maneuvering
orchestrated by senior policy officials in the Bush Administration. As a result,
presidential hopeful Senator John Kerry called on the U.S. Interior Department's
Inspector General to look into whether "political pressure from the White House
is intimidating staff and influencing policy" in Klamath River management
decisions. Interior Department Inspector General Earl Devaney’s report –
released in March 2004- found “no evidence of political influence affecting the
decisions pertaining to the water in the Klamath Project.”
A 2002 Editorial Headline
Between 2002-2004, the fish die-off was effectively spun by Klamath Project
critics to drive a dizzying array of attacks aimed at the Bush Administration
and federal agencies responsible for Klamath Project management.
Well-coordinated media coverage surrounding several acts of litigation and
proposed federal legislation in the two years since the fish die-off have
effectively imprinted the environmentalists’ message in the minds of many:
“Fish need water”;
“Klamath Project farmers were denied water in 2001 and no fish died in the
Klamath River”;
“Klamath Project farmers received full supplies in 2002, and 33,000 salmon
died in the river”;
“The Bush Administration sacrificed fish for the benefit of farmers.”
The claims discussed above are just a few of the more prominent arguments that
Klamath Project critics have employed to justify a series of actions undertaken
in the wake of the public release of the interim NRC Committee report, including
the following:
Federal legislation that would finalize a controversial and flawed draft
Klamath River flow report.
Unsuccessful federal legislation that would restrict the ability of local
lease land farmers to grow row crops.
Litigation (PCFFA v. USBR) that, if successful, would have likely shut down
Klamath Project operations in 2003.
Public protests staged by tribal members and environmentalists in Klamath
Falls in 2002 and in Sacramento in 2003.
Listing of the Klamath River as the third most endangered waterway in the
country by American Rivers, a Washington, D.C. – based activist group.
An unsuccessful lawsuit filed by environmental groups against NOAA Fisheries
to hasten the potential ESA listing of the green sturgeon.
The release of an Oregon Natural Resources Council (ONRC) report, which
contends that voluntary buyouts of willing sellers within the Project “remain
the most politically responsible, socially just, and economically viable method”
to address power and ecological challenges.
A subsequent letter sent by ONRC to Project landowners, tempting them with the
promise of a buyout that would provide them with 2 ˝ times the fair market value
of their land.
Numerous editorials, journal articles and magazine stories that clearly accept
the arguments made by Project critics.
However, others did not jump so quickly on to the “blame game bandwagon.” During
late summer and early fall of 2002, Dave Vogel, a fisheries biologist with 28
years of experience, conducted a field investigation to assess water
temperatures in the main stem Klamath River. Vogel noted that main stem water
temperatures in the Klamath River were measured hourly just prior to and during
the fall-run Chinook salmon migration season. He found that water temperatures
in the upper Klamath River downstream of Iron Gate Dam during September 2002
were unsuitable for adult salmon, a finding that was similar to that of previous
studies. As expected, a normal seasonal cooling trend at the end of September
and early October provided the moderating influence lowering Klamath River
temperatures to tolerable levels for salmon. Vogel also found that large numbers
of salmon entered the lower Klamath River earlier than usual and were exposed to
two dramatic and uncharacteristic cooling and warming conditions causing disease
outbreak from warm water and crowded conditions.
The combination of these factors was chronically and cumulatively stressful to
fish and is probably the most plausible reason for the fish die-off.
“In my opinion, the best available scientific data and information indicate that
the continued operation and maintenance of historical flows at Iron Gate Dam
will not jeopardize coho salmon,” said Vogel in March 2003. “Furthermore, in my
opinion the operations of Iron Gate Dam during the summer and fall of 2002 did
not cause and could not have prevented the fish die-off in the lower Klamath
River.”
Unfortunately, scant media coverage was afforded to Vogel’s findings. Outside of
the Upper Basin, the press made no mention of the fact that, despite the
die-off, the numbers of fish returning to Iron Gate hatchery on the Klamath
River were the third highest in 40 years. The media also largely ignored a
similar finding made in October 2003 by the National Research Council Committee
on Endangered and Threatened Fish in the Klamath Basin. In its final report, the
Committee failed to find a linkage between the operation of the Klamath Project
and the fish die-off, and questioned whether changes federal project operations
at the time would have prevented it.
Clearly, the hard working landowners of the Upper Klamath Basin have been on the
receiving end of a cruel and long-distance war being waged by environmental
activists who assert that the federal water project – representing only 2
percent of the total land base of the Klamath River watershed, and consuming
only 3-4 percent of the average annual flows to the Pacific Ocean – is somehow
responsible for all of the environmental woes of the river system. These
advocates are intent on portraying the Klamath Basin as a poster child to help
fuel outside efforts that are focused on litigating, legislating and publicly
condemning the local community for doing what it has done for 98 of the last 99
years – irrigating farm and ranch land.
These interests know that federal water projects are an easy target of
litigation, since federal environmental and clean water laws govern project
operations. The lawsuits are often aimed at federal entities – such as the U.S.
Bureau of Reclamation and fishery agencies – which, on the surface, give the
appearance that the environmental plaintiffs are simply interested in correcting
errors made by some non-descript governmental agency. The true intended target
of these actions, however, ultimately becomes the landowners and water users who
fall under the management jurisdiction of the federal agencies. It is the
farmers and ranchers that pay the price of litigation through altered management
practices, increased uncertainty, and escalating legal expenses to defend their
interests.
For the most part, the potentially damaging effects these actions could cause
family farmers and ranchers have been deflected. However, local water users are
concerned that permanent Klamath River policy will be influenced by
misinformation in the future.
Vindication, Part II
After an 18-month barrage of anti-Klamath Project attacks in the media and
courtrooms, the long-awaited final report from the National Research Council
(NRC) Committee on Endangered and Threatened Fishes in the Klamath Basin was
released in October 2003. The final NRC report is important to local farmers and
ranchers for several key reasons:
1. The report clearly indicated that recovery of endangered suckers and
threatened coho salmon in the Klamath Basin cannot be achieved by actions that
are exclusively or primarily focused on operation of the Klamath Project.
2. The committee also reconfirmed its findings from the earlier interim report
that found no evidence of a causal connection between Upper Klamath Lake water
levels and sucker health, or that higher flows on the Klamath River mainstem
help coho salmon.
3. The NRC committee did not accept arguments that the operation of the Klamath
Project caused the 2002 fish die-off or that changes in the operation of the
Project at the time would have prevented it.
Despite the final conclusions, some environmentalists and many in the media
continue to maintain the sensational but unsupported position that the Klamath
Project was responsible for the 2002 fish mortality that occurred over 200 miles
from the Klamath Project.
The final NRC report was consistent with what Upper Basin interests have been
saying for years: the Klamath Project cannot solely bear the burden for species
recovery in this basin. A watershed-wide approach to species recovery – one that
addresses all the stressors to fish – is essential to improving the environment
and saving the local economy.
Local water users shared the NRC report’s vision that increased knowledge,
improved management, and cohesive community action would promote recovery of the
fishes. At the same time, they remained extremely concerned that the “business
as usual” approach - regulation of the Klamath Project – would remain the
dominant aspect of ESA biological opinions and advocacy of Project opponents.
For reasons now clearly evident, the irrigators’ original recommendation for an
outside technical review of the ESA activities in the Klamath basin by an
objective group such as the National Academy of Sciences back in 1993 (KWUA
1993) was an important first step. The benefits of an ESA peer review are
obvious after reading the NRC’s final report.
“We are beginning to see signs of progress with ESA activities in the basin,”
said Dave Vogel, nearly one year after the release of the final NRC Committee
report. “However, alarmingly, there are some individuals within the agencies
that are in a state of denial over the findings and conclusions of the NRC’s
report. Despite the NRC’s final report, the USFWS and NOAA Fisheries still have
too much focus on the Klamath Project and not enough emphasis on a
watershed-wide approach.”
Other experts agree.
“We found that the prevailing scientific sentiment in the basin–‘More water is
better for fish’- was the wrong approach,” NRC Committee member Jeffrey Mount
told California Farmer magazine in December 2003, two months after the final NRC
report was released.
“We hate to say we told you so, but….”
It is very important to note that many of the most pertinent findings,
conclusions, and recommendations of the NRC Klamath Committee were not new to
the USFWS or NOAA Fisheries. Dave Vogel elaborated on this in testimony he
provided to the House Resources Committee at a field hearing held in Klamath
Falls in June 2004.
“The NRC final report advocates a watershed approach, peer review, greater
stakeholder involvement, oversight of agency actions, focus on factors other
than the Klamath Project operations, reduction of resource conflicts, and
incorporation of the principles of adaptive management toward species recovery,”
said Vogel. “Over the past decade, local water users and their allies forwarded
much of the same and similar technical findings and recommendations to those two
agencies, but were mainly ignored. Additionally, the NRC’s major conclusion that
there is insufficient scientific justification for high reservoir levels and
high instream flows was always prominent in water users’ technical comments on
the agencies’ biological opinions during the past decade.”
“The NRC Klamath Committee’s final report was an outstanding effort and the
product must serve as a catalyst to advance balanced natural resource management
in the basin,” Vogel said. “If federal agencies meaningfully incorporate many of
the NRC’s principal findings, conclusions, and recommendations, we fully expect
positive results to the species recovery and reduced resource conflicts. We
should use the momentum of the NRC’s final report to guide recovery efforts and
watershed improvements. However, if the agencies do not take this pro-active
approach, we could again return to the disaster that transpired in 2001.”
Dr. Mount agrees.
“For too long, Klamath managers have relied on fixing their problems by turning
only one knob- the knob of raising and lowering water levels in Upper Klamath
Lake and the river,” said Mount, a University of California professor. “They
need to take new approaches that support multiple populations of fish and
healthy ecosystems throughout the watershed,” he said.
The Klamath Project Regulatory Regime: 3 Years After the Curtailment
The U.S. Bureau of Reclamation’s final 10-year Biological Assessment for Klamath
Project 2002-2012 operations properly incorporated the findings of the 2002
interim National Research Council’s (NRC) interim report, and generally captured
the essence of the “watershed-wide” philosophy endorsed in the final 2003 NRC
report.
Unfortunately, the fishery agency biological opinions (BOs) do not. Despite the
so-called ecosystem approach to species recovery advocated by the USFWS and
NMFS, their actions in the Klamath basin over the past decade amply demonstrates
that the exact opposite took place. They focused on: 1) a single-species
approach; and 2) Klamath Project operations.
The USFWS opinion continues to perpetuate the questionable assumption that lake
level management is the principle mechanism affecting sucker survival in Upper
Klamath Lake (UKL). The NOAA Fisheries jeopardy decision similarly continues to
place high emphasis on downstream flows. The stored water developed for Klamath
Project farmers continues to be reallocated to meet the artificial demands set
by agency biologists.
The combined – and apparently, unanticipated – impacts placed on the Upper Basin
community from the application of the two opinions are unacceptable. On June
25th, 2003, local irrigators were told by Reclamation officials that UKL
diversions to the Project would be shut down for a minimum of 5 days – in the
middle of the growing season. By day’s end, reason prevailed: the agencies
backed off their initial request and instead, Reclamation notified farmers to
continue their efforts to reduce diversions from the lake. This was driven by
one apparent agency mission: to avoid dropping UKL one inch below a lake level
requirement established by the USFWS.
Rancher Gary Wright learns that the Klamath Project would be shut down in the
middle of the irrigation season, June 25, 2003. Common sense prevailed, and
later in the day, Reclamation rescinded its earlier decision.
In addition to the continued uncertainty irrigators face, the opinions are
generating new, unanticipated impacts to the community. In the past 40 to 50
years, while the cropping pattern in the Klamath Project has varied from year to
year, the overall planted acreage has remained consistent. On the other hand,
the 2002-2012 biological opinion created by NOAA Fisheries for coho salmon
established the river flow schedule and an “environmental water bank” – which
ratchets up to 100,000 acre-feet in 2005, regardless of actual hydrologic
conditions – that is the primary source of new demand for water in the Klamath
River watershed.
The result: stored water that has flowed to farms, ranches and the refuges for
nearly 100 years is now sent downstream at such high levels, that groundwater
pumped from the Lost River basin is being used to supplement the resulting “coho
salmon demand” in the Klamath River.
It is not the farmers who have imposed new water demands that, in essence, have
made groundwater the default supplemental supply to the Klamath Project. It is
the opinions of agency fishery biologists who have fundamentally altered how
this century-old water project operates, and who have apparently failed to
anticipate the resulting impacts to the community.
While Reclamation in 2002 sharply disagreed with the findings of both fishery
agency biological opinions, it is not yet clear how consultation will be
reinitiated to create a new operations plan.
Proactive Efforts of Upper Basin Landowners
Since the early 1990s, and particularly in the new millennium, local water users
– both within the Klamath Project and those who farm in upstream areas north of
Upper Klamath Lake – have taken proactive steps to protect and enhance water
supplies, enhance the environment, and stabilize the agricultural economy.
Farmers and ranchers in the Klamath Project have consistently supported
restoration actions to improve habitat for the basin’s fish and wildlife
species.
Sucker Recovery Planning
KWUA in 1993 published the Initial Ecosystem Restoration Plan – the first
ecosystem-based, scientifically valid planning document on Klamath Basin
restoration. The plan placed particular emphasis on real, on-the-ground projects
to recover endangered species. It was widely recognized as a meaningful
assessment of necessary restoration activities. KWUA in 2001 reiterated its
previous call with the release of a report entitled Protecting the Beneficial
Uses of Upper Klamath Lake: A Plan to Accelerate Recovery of the Lost River and
Shortnose Suckers. The 2001 report provided timelines and budgets for dozens of
projects that could provide real benefits. Regrettably, until the past three
years, there has been failure to effectively implement most of the on-the-ground
activities proposed by KWUA.
On-the-Ground Actions
Local agricultural and business leaders have dedicated thousands of volunteer
hours and have spent millions of dollars in the past ten years to participate in
processes associated with environmental restoration, Klamath Basin water rights
adjudication, dispute resolution, drought-proofing, and water supply
enhancement. Most impressive, however, is the multitude of actions undertaken
on-the-ground:
Local efforts to assist National Wildlife Refuges (e.g. “Walking Wetlands”)
Ecosystem Enhancement and Sucker Recovery Efforts in the Upper Basin
Fish Passage Improvement Projects
Wildlife Enhancement and Wetland Restoration Efforts
Local Efforts to Improve Water Quality
Power Resource Development
Efforts to Improve Klamath Project Water Supply Reliability and Water Use
Efficiency
Many of these efforts were driven by an initial desire to implement meaningful
restoration actions intended to provide some sort of mitigation “credit” that
could be applied towards reducing the burden carried by Klamath Project
irrigators to “protect” threatened and endangered fish species. For many years,
that credit was not recognized.
For example, Federal agencies or non-profit conservation groups have acquired
over 25,000 acres of farmland in the Upper Klamath Basin for habitat purposes.
Each time the agencies sought additional land, they promised that each
acquisition would provide environmental benefits, reducing pressure on the
Klamath Project’s family farmers and ranchers. Those promises have not
materialized, and Project irrigation water still remains the sole regulatory
tool used to address federal ESA objectives for endangered suckers and
threatened coho salmon in the Klamath River watershed.
XXX
Environmental Water Bank
KWUA in early March 2003 announced it would support, and assist the Department
of Interior in the implementation of, a Klamath Project Pilot Environmental
Water Bank in 2003 to provide over 50,000 acre-feet of additional water for
environmental purposes. Reclamation’s 10-year Biological Assessment (BA)
developed in February 2002 proposed an environmental water bank through which
willing buyers and sellers will provide additional water supplies for fish and
wildlife purposes and to enhance tribal trust resources. The 2002-2012
biological opinion created by NOAA Fisheries for coho salmon firmly established
the river flow schedule and the water bank – which ratchets up to 100,000
acre-feet in 2005, regardless of actual hydrologic conditions – that is the
primary source of new demand for water in the Klamath River watershed.
The coho biological opinion's rigid water bank schedule, which steps up the
magnitude of the bank for the first four years, regardless of actual hydrology,
is difficult to justify. This type of water bank does not reflect the intent of
either the proposal put forth by KWUA in 2002 (see below), or the original USBR
biological assessment, which proposed implementation of a water bank in drier
years, not every year.
Water users committed to pursue developing a water bank with Reclamation in
January 2002. At that time, KWUA was asked by Reclamation to develop a
Project-wide water bank to assist with meeting environmental water demands in
drier years. KWUA’s Water Bank and Supply Enhancement Committee held over 30
meetings in 2002-03 to develop the 65-page report/proposal for a long-term water
bank, which differs substantially from the pilot water bank proposed by
Reclamation this past year. Certainty of water supplies is a key principle
imbedded in KWUA’s long-term water bank proposal. Local water users insist that,
in exchange for voluntary participation in a Project water bank – which would be
used to “fund” environmental water needs - 100% of the irrigation demand for
remaining Project acreage will be satisfied, season-long. Water users further
believe that the water bank cannot be viewed as a stand-alone element. While
Reclamation’s 2003 and 2004 pilot programs did not closely resemble KWUA’s
vision for a long-term bank, water users are hopeful that Reclamation and
Interior will look to the irrigators’ document to complete its 10-year water
bank proposal.
EQIP Funding in Klamath Basin
The federal government in 2003 released $7 million in conservation funding to
the Klamath Basin. This sum represents a portion of the $50 million in funding
earmarked for the Basin in the 2002 Farm Bill under the Environmental Quality
Incentives Program (EQIP). KWUA was instrumental in securing these provisions
during Farm Bill negotiations. In 2004, Interior Secretary Norton included
another $12 million for this program in the president’s 2005 budget request. The
funds provided cost-share payments to farmers and ranchers to employ water
conservation measures. Over 800 Klamath Basin landowners have applied to
participate in this program, despite the requirement that they pay 25% of the
costs. This shows remarkable commitment by local irrigators to do the right
thing, despite the fact that many of these landowners are still recovering from
the financial impacts of the 2001 water curtailment.
Recognition at Last
In the past year, local irrigators have finally begun to get the recognition –if
not the actual regulatory relief - they deserve for their proactive efforts. To
wit:
KWUA was awarded the 2003 “Leadership in Conservation” award by the Oregon
Department of Agriculture;
KWUA in 2004 was honored on the steps of the Oregon state capitol for
“exemplifying the spirit” of the Oregon Plan for Salmon and Watersheds;
Tulelake Irrigation District in January 2004 received the F. Gordon Johnston
award for its innovative canal lining project completed near Newell; and
U.S. Secretary of Agriculture Ann Veneman and NRCS chief Bruce Knight in 2004
recognized local rancher Mike Byrne for his leadership in conservation.
NRCS Chief Bruce Knight (left) with 2004
Excellence in Conservation Award winner Mike Byrne.
It is clear that local irrigators have not been idle in the past ten years.
Their efforts to improve their environment are all the more impressive when one
considers that the uncertainty and difficulty associated with keeping their
farming operations profitable have not diminished.
Oregon Governor Ted Kulongoski, Congressman Greg Walden and
KWUA Executive Director Dan Keppen at the new A Canal Headgates, April 2003.
50 Years After the Compact – Back to the Watershed-Wide Approach
Klamath Project water users in October 2004 enthusiastically greeted the
announcement that the states of California and Oregon and the Bush
Administration had signed the historic “Klamath River Watershed Coordination
Agreement”. The agreement –signed by California Governor Arnold Schwarzenegger,
Oregon Governor Ted Kulongoski, and four of President Bush’s cabinet level
secretaries – underscored the commitment of these parties to solve the fisheries
challenges of the Klamath River on a watershed – wide basis.
The state-federal Klamath agreement reflects the philosophy embedded in both the
Klamath River Basin Compact and the 2003 NRC Klamath report, which confirmed
that Klamath Basin issues must be dealt with in an integrated and comprehensive
way for a lasting solution of the challenges facing the basin. The NRC committee
report makes clear that merely closing the spigot on the Klamath Project will
not solve the problems facing Klamath Basin fisheries, and that strategy
obviously was disastrous for farming and ranching communities. The coordination
agreement recognizes that message and promotes a unified effort that many water
users believe is much needed.
An important part of this agreement is that it supports the Conservation
Implementation Program (CIP), a work in progress proposed by federal agencies to
coordinate management actions in the Klamath River watershed. The CIP would meld
a scientific advisory body, local communities, and resource agencies to
identify, coordinate and resolve the Basin’s critical water quality, water
quantity and fish and wildlife restoration challenges.
KWUA is working with other producer groups and local government to develop
guidelines that make the CIP workable and acceptable to Klamath Basin
communities.
USBR Study on Pre-Project Flow Conditions on Upper Klamath River
Reclamation in late 2004 finalized a draft study intended to provide a glimpse
at how the Klamath River might have looked before the Klamath Project was built.
The report shows that– especially in drier years – historic flows in the Klamath
River near Keno, Oregon dwindled to a mere trickle. The report provides
compelling evidence that supports claims made by local residents for decades –
the stored water provided by the Klamath Project may actually provide more flows
downriver than what would have flowed before the Project was built. This is
primarily due to the developed storage and the fact that farmlands that were
once under water now use less water than what was historically lost to
consumptive and evaporative use of the former marshes.
Excerpt from Draft BOR Flow Study
Conclusion – The Future
To solve the problems of the Klamath River watershed, we need a coordinated
management program that spans two states in a watershed that is characterized by
a strong federal presence. Competition among stakeholder groups – including four
tribes, agricultural water users, and countless environmental groups – is
fierce. In order to be successful, we need to better understand the real state
of the watershed by developing the facts and best possible information to make
the best possible decisions. Collaborations need to replace ideological
advocacies; watershed wide approaches need to replace regionalism; and honest
exchanges of information need to displace environmental sensationalism.
A June 20, 2004 editorial published by the Klamath Falls Herald & News provides
an apt glimpse of what the future might bring to the Klamath irrigation
community and how the Klamath Water Users Association will address that future:
Recently, the Klamath Water Users Association got an award for not using water,
which is not a contradiction in terms at all. It's a matter of doing what has to
be done to keep farming and ranching alive in the Klamath Basin.
The award was from the state of Oregon and recognized the water users' efforts
in behalf of the Oregon Plan for Salmon and Watersheds. It was presented to the
group in a ceremony on the steps of the Capitol, with leaders such as Gov. Ted
Kulongoski and the Democratic and Republican leaders of the Legislature
participating.
The award recognizes a welter of actions in the Basin, some using federal and
state dollars and some not, many aimed at making agricultural operations more
efficient water users. Some have given agriculture interests heartache, such as
the conversion of farmlands to wetlands - the water users cite 24,000 acres in
the past decade, equal to more than a tenth of the Klamath Reclamation Project.
Nevertheless, it's clear that farmers and ranchers have recognized their
predicament given the pressure of the Endangered Species Act and competition for
water from Indian tribes upstream and down. Agriculture is in the midst of a
struggle that could take decades yet to play out, and its defenders are
determined that they will survive.
This is a longer-term version of the creativity they showed in 2001, when, faced
with imminent ruin, they responded with skill and imagination in a political
protest that brought national attention and saved Basin agriculture to fight
another day.
The vision of the Klamath Basin as a place for human habitation must include
agriculture, and an agricultural sector of sufficient size to be economically
viable. This place ought to have an urban center and a scattering of pleasant
small towns - and in between green fields with dancing water from irrigation
works.
Whatever alternate vision exists involves blowing away towns such as Merrill,
Malin and Tulelake and shriveling the city of Klamath Falls. It involves
throwing lots of people off the land, and it's not acceptable.
This is not the first such award, and won't be the last. It is a signal of a
widening recognition in Oregon and the nation that farmers and ranchers will do
good things here to make sure that they can continue in their necessary and
honorable work.
The Klamath Water Users Association, with the talents and support of the
community, will continue to address the resource needs of its constituency in a
proactive and creative manner. The KWUA has shown itself to be steadfast and
able in protecting water users while being receptive to innovative and
reasonable solutions. Our irrigating communities, through the continued efforts
of the KWUA, will always be persistent and adaptable representatives of our
American heritage. The “future”…bring it on, we can handle it.
Father and daughter ride to the headgates, summer 2001.
Notes
Information sources used in the preceding report sections are further described
below.
Overview
The source for much of this information comes from the Klamath Water Users
Association 2003 Water Bank report.
Pioneers
The Department of the Interior, United States Reclamation Service 1913 report
entitled “History of the Klamath Project. Oregon-California. From May 1, 1903 to
December 13, 1912”, written by I.S. Voorhees, contains detailed accounting of
early irrigation works in the Upper Klamath Basin. Paul Simmons of Somach
Simmons and Dunn also made significant contributions based on research he and
his staff conducted on behalf of Klamath Project water users in the State of
Oregon Klamath River adjudication process.
The Klamath Basin Calls in the United States Government
The Voorhees document, noted above, details this issue.
Construction Begins
The source for much of this information comes from the Klamath Water Users
Association 2003 Water Bank report, the Voorhees report, and the affidavit and
testimony of Rebecca Meta Bunse, who in 2004 prepared a detailed historic
summary of Klamath Project development on behalf of Klamath Project irrigators
for the Klamath River adjudication process. (Reference No. 003E00040050, before
the Office of Administrative Hearings, State of Oregon, for the Water Resources
Department). Paul Simmons of Somach Simmons and Dunn also made significant
contributions based on research he and his staff conducted on behalf of Klamath
Project water users in the State of Oregon Klamath River adjudication process.
The Bureau of Reclamation Klamath Basin Area Office also provided factual data
on the Klamath Project.
Homesteaders
The Journal of the Modoc County Historical Society, No. 18-1996, focuses
exclusively on twentieth century development of the Tule Lake area. Betty Lou
Byrne-Shirely’s “The Reclamation of Tule Lake” and the February 1947 Reclamation
Era article “Gold Mine in the Sky”, both included in the Modoc County historical
journal, served as sources for the homesteader information. Quotes made by Dave
Carman, a World War II veteran Tule Lake homesteader, were pulled from his
testimony submitted at a House Resources Committee field hearing in Klamath
Falls in June 2004.
The Klamath River Compact
The source for much of this information regarding development of the Compact
comes from the affidavit and testimony of Stephen R. Wee, who in 2004 prepared a
detailed historic summary of Klamath Project water rights and related issues on
behalf of Klamath Project irrigators for the Klamath River adjudication process.
(Reference No. 003E00040049, before the Office of Administrative Hearings, State
of Oregon, for the Water Resources Department). The conclusion of this section
contains the actual purposes of the Compact, as identified in Article I of that
document.
The Klamath Project’s Finishing Touches
The source for much of this information comes from the Klamath Water Users
Association 2003 Water Bank report, the Voorhees report, and the affidavit and
testimony of Rebecca Meta Bunse, who in 2004 prepared a detailed historic
summary of Klamath Project development on behalf of Klamath Project irrigators
for the Klamath River adjudication process. (Reference No. 003E00040050, before
the Office of Administrative Hearings, State of Oregon, for the Water Resources
Department). Paul Simmons of Somach Simmons and Dunn also made significant
contributions based on research he and his staff conducted on behalf of Klamath
Project water users in the State of Oregon Klamath River adjudication process.
New Demands
Legal documents prepared by the Klamath Water Users Association attorney – Paul
Simmons, of Somach, Simmons & Dunn – provide much of the background information
regarding the steadily increasing regulations faced by Project irrigators,
starting in the 1990s. Specifically, the plaintiffs’ memorandum of points and
authorities in support of motion for preliminary injunction (Kandra et al v.
United States of America) was relied upon. Also, David Vogel’s testimony before
the U.S. House of Representatives Committee on Resources oversight field hearing
in June 2004 provides an excellent treatise on the real reasons for the decline
of suckers in the Upper Klamath Basin. The Klamath Water Users Association
previously developed the section that assesses stressors to coho salmon during
the 1990s.
Problems on the East Side
This section derives from an excellent letter (dated July 28, 2004) prepared by
Best Best & Krieger on behalf of Horsefly Irrigation District and Langell Valley
Irrigation District. The letter was submitted to the U.S. House of
Representatives Resources Committee in connection with a congressional field
hearing held in Klamath Falls in July 2004.
2001 Curtailment
Of the numerous media accounts of the 2001 water cutoff, I believe Blake Hurst’s
piece “Calamity in Klamath”, which originally was published in The American
Enterprise magazine in late 2002, is the best. I have borrowed liberally from
Mr. Hurst, particularly his assessment of the impacts to the community of
Tulelake, California. Jess Prosser’s comments were originally printed in Range
Magazine in 2001.
The Farmers Fight Back
The comments regarding the “desperate community” were pulled from an outstanding
paper presented by Paul Simmons at the American Bar Association Environmental
Section Fall 2004 Meeting.
Enter President Bush
I was in the audience when President Bush made his speech in Portland. After the
president’s speech, I met Congressman Greg Walden for the first time; he
conveyed to me some of the details of the president’s flight over the Klamath
Basin earlier in the day.
Vindication: The National Research Council Steps In
This section was derived from press statements developed by KWUA in early 2002.
The Assault on the Klamath Project Intensifies
Most of this section derives from personal experience, and the latter part was
pulled directly from an opinion piece I was asked to write for a Boise, Idaho
newspaper at the request of Idaho water users who were also being attacked by
some of the same activists engaged in Klamath issues.
Vindication, Part II / “We hate to say we told you so, but….”
Much of this information originates in Dave Vogel’s written testimony that he
submitted to the House Resources Committee in June 2004. After more than a
decade of professional and sometimes, personal criticism by agency and tribal
biologists, the final NRC Report perhaps vindicated Dave Vogel more than anyone
else.
The Klamath Project Regulatory Regime: 3 Years After the Curtailment
This section was written based on personal experience of the author.
Proactive Efforts of Upper Basin Landowners
We refer you to www.kwua.org and a 45-page document entitled Summary of Recent
and Proposed Environmental Restoration and Water Conservation Efforts Undertaken
by Klamath Water Users and Basin Landowners for further information on this
topic.
50 Years After the Compact – Back to the Watershed-Wide Approach
This perspective comes from KWUA assessments and press releases.
USBR Study on Pre-Project Flow Conditions on Upper Klamath River
The USBR study is incredibly important, because, for the first time, it provides
a numerical modeling assessment of the conditions that likely existed on the
Upper Klamath River before Europeans settled the area. Prior to this effort,
assertions that flow conditions in the river were likely lower than the present
could only be backed up by anecdotal (albeit accurate) reports and incomplete
flow studies.
Conclusion – The Future
The June 20, 2004 Herald & News editorial on recent water user efforts provided
a fitting ending to this report, which is further enhanced by language developed
by Steve Kandra, 2004-05 KWUA President.
Lower Klamath Lake National Wildlife Refuge, California
Photo Credits
1. Cover photo – courtesy of Jacqui Krizo.
2. Map of Klamath Project – courtesy of Bureau of Reclamation.
3. “A load of produce from the Klamath Fair, October 1907” – courtesy of
Tulelake-Butte Valley Fair, Museum of Local History (TBVF Museum).
4. “1906 Map of Pre-Project Area” – courtesy of Oregon Water Resources
Department.
5. “Adams Cut, July 18, 1906” – courtesy of Tulelake -Butte Valley Fair, Museum
of Local History.
6. “1907 Completion of the A Canal Headgates” – courtesy of U.S. Bureau of
Reclamation.
7. “Constructing Clear Lake Dam, September, 1909” – courtesy of TBVF Museum.
8. “1927 Homesteader Affidavit” – courtesy of Somach, Simmons and Dunn
9. “Farm Lottery Article, Life Magazine” – courtesy of Bureau of Reclamation.
10. “The Sign Says it All” – courtesy of U.S. Bureau of Reclamation.
11. “Homesteaders: Robinsons in 2001 Remember Days Gone By” – courtesy of Anders
Tomlinson
12. J.C. Boyle Dam on the Klamath River – courtesy of PacifiCorp.
13. “Tulelake, California” - courtesy of Rob Crawford
14. “Del Norte Salmon Cannery” – courtesy of Anders Tomlinson
15. “April 6, 2004 Headlines” – courtesy of Anders Tomlinson
16. “Kliewer Family in Dry Fields South of Klamath Falls” – courtesy of Anders
Tomlinson
17. “Cemeteries went Dry in 2001” – courtesy of Rob Crawford
18. “Time Magazine Captures Rob Crawford & Family” – courtesy of Rob Crawford
19. Klamath Bucket Brigade – courtesy of Klamath Relief Fund.
20. Prayer / Protest at Headgates – courtesy of Klamath Relief Fund.
21. President Bush Photo courtesy of Rob Crawford
22. Tulelake Rancher Gary Wright, June 2003 – courtesy of Pat Ratliff
23. Walking Wetlands photo – courtesy of Anders Tomlinson.
24. Bruce Knight and Mike Byrne – courtesy of U.S. Department of Agriculture
25. Gov. Kulongoski, Rep.Walden, and Dan Keppen at the A Canal, 2003 – Courtesy
of Pat Ratliff
26. Undepleted Natural Flow of the Upper Klamath River – U.S. Bureau of
Reclamation.
27. “Father and Daughter Ride to the Headgates” – courtesy of Rob Crawford
28. “Lower Klamath Lake National Wildlife Refuge, California” – courtesy of
Scott Harding Photography