Time to Take Action
Our Klamath Basin Water Crisis
Upholding rural Americans' rights to grow food,
own property, and caretake our wildlife and natural resources.
 

Tulelake Irrigation District groundwater pumped, with no reimbursement to TID,
to replace our stored water that was sent downriver, or kept in Klamath Lake for sucker mandate.

TID WELLS (AUGUST 1, 2003)

TOTAL

DATE

TIME

DATE

TIME

METER

METER

AF

STATIC

SITE

STARTED

STARTED

CHECKED

CHECKED

GPM

CFS

START

PRESENT

PUMPED

HEAD

1

7/23/03

6:20 AM

8/1/03

7:40 AM

10,500

23.4

3034.31

3118.98

84.67

24.9

2

7/23/03

6:35 AM

8/1/03

8:00 AM

11,500

25.6

5594.64

6040.69

446.05

36.2

3

7/23/03

6:45 AM

8/1/03

8:15 AM

8,000

17.8

3332.90

3648.53

315.63

35.8

4

7/23/03

7:00 AM

8/1/03

8:30 AM

11,500

25.6

3601.03

3845.70

244.67

30.9

5

7/23/03

7:10 AM

8/1/03

8:40 AM

8,500

18.9

4095.01

4207.03

112.02

30.7

6

7/23/03

7:25 AM

8/1/03

8:55 AM

5,200

11.6

2822.37

3017.26

194.89

33.4

7

7/23/03

7:50 AM

8/1/03

9:10 AM

4,200

9.4

3579.09

3744.99

165.90

51.8

8

7/23/03

8:35 AM

8/1/03

9:45 AM

4,000

8.9

3477.82

3641.46

163.64

33.0

9

7/23/03

8:10 AM

8/1/03

9:30 AM

6,500

14.5

1766.01

1981.87

215.86

30.7

14

7/23/03

9:10 AM

8/1/03

10:20 AM

12,400

27.6

3299.09

3426.21

127.12

24.3

TOTAL CFS

183.4

TOTAL AF PUMPED JUNE 20 THRU JULY 1

3104.64

TOTAL AF PUMPED JULY 1 THRU JULY 9

2317.80

TOTAL AF PUMPED JULY 9 THRU JULY 16

2221.29

TOTAL AF PUMPED JULY 16 THRU JULY 23

2115.54

TOTAL AF PUMPED JULY 23 THRU AUGUST 1

2070.45

TOTAL PUMPED

11829.72

 

Home

Contact

 

Page Updated: Saturday February 25, 2012 05:29 AM  Pacific


Copyright © klamathbasincrisis.org, 2001, All Rights Reserved